Assurance · Capacity report

Capacity report

How much space, power and cooling is left in the server room – and what does it take to expand without interrupting operations? A capacity report maps it rack by rack and switchboard by switchboard and becomes the link between IT and facilities.

U by U
Every rack is documented unit by unit with supply, PDU and free space
3 phases
Load is measured per phase and compared with the upstream fuse
A + B
We record which equipment has dual supply and where an STS is missing
Impartial
The report is independent of products and suppliers

The link

Two areas of responsibility, one server room

In most companies the server room is shared by two areas that work closely together but each have their own focus. IT runs hardware and software. Facilities are responsible for the support equipment: switchboards, UPS, cooling, generator and fire systems.

Neither has the full picture of the other side – and it is exactly the other side that decides whether their own area can grow. The capacity report brings both sides together in one document.

ITFacilitiesServersStorageNetworkSoftwareSwitchboardsUPS systemsCoolingGeneratorFire systemsCapacityreportSpace · Power · Cooling
Before buying

The report shows the details the buyer needs. Before new equipment is purchased, you can see where it can be placed with the right space, power and cooling – and plan the budget accordingly.

The questions

What the report answers

The need for a capacity report typically arises when IT is expanding, when a system is nearing replacement, or when the business continuity plan needs facts about technical capacity.

The list is not exhaustive, but shows the questions we typically clarify.

  • Space
  • Power
  • Cooling
  • Supply paths
  • Cabling
  • Testing
Questions the capacity report clarifies
AreaWhat we clarify
SpaceHow rack space and the footprint of IT and power equipment are used – and whether it can be optimised to free up space without more cooling and new switchboards
Switchboards and circuit breakersCapacity in the switchboards, the settings of the circuit breakers and which switchboards feed the rack PDUs
UPS systemsLoad, reserve and redundancy compared with the capacity the system was built for
CoolingThe capacity of the cooling system and whether it is set correctly
Phase loadWhether the load is evenly distributed across the three phases, and a strategy for the diversity factor relative to the upstream fuse
Supply pathsWhich equipment has dual supply, whether single-corded equipment has an STS, whether there are enough outlets in the racks, and whether local extension leads are used
CablingWhether fibre and patch cabling gets in the way of technicians and risks being disconnected during service in and around the racks
TestingWhether switchboards and support equipment can be tested without putting critical operations at risk

The survey

The whole server room, not just the racks

We go through the server room physically and record everything that affects capacity and operational reliability – from the installed hardware to switchboards, emergency power, cooling and infrastructure.

The result is collected on a floor plan where every rack, cooling unit and switchboard has its own number, and where our comments are written directly on the drawing.

Cold aisleCoolingCoolingBoardUPS123456
The floor plan is an example
What we survey
AreaWhat we record
1RacksServers, hard disks, network equipment, audio and video and other equipment
2PDUsWhich switchboards and circuits feed them, and how heavily they are loaded
3No-break switchboardCircuits, circuit breakers and load
4UPS system and generatorLoad, reserve, batteries and emergency power
5Cooling unitsCapacity, placement and settings
6InfrastructureInstallation above and below 50 V, fibre, fire systems, lighting and working conditions

Rack by rack

Every rack documented unit by unit

For each rack we make a drawing and a schedule showing the equipment in order from top to bottom: what it is, how many power supplies it has, and which PDU they are plugged into.

Free space and blanking panels are shown, so it is clear where new equipment can go and where the airflow is broken.

PDU APDU BServerServerFree spaceStorageServerFree space
  • Equipment
  • Blanking panel
  • Free space
  • Both power supplies in the same PDU
The schedule for each rack
ColumnWhat it shows
Position (U)Where in the rack the equipment sits and how much space it takes
Type and nameWhat the equipment is and what it is called in your systems
Power suppliesWhether the equipment has one or two power supplies
PDU A and PDU BWhich PDU each power supply is plugged into, and which switchboard feeds the PDU
CommentsFaults and improvements, e.g. both power supplies in the same PDU or missing blanking panels

Load

Load per phase decides the expansion

We measure the load per phase in the upstream switchboard and in the rack PDUs. Compared with the upstream fuse and the free space in the racks, the room for expansion can be calculated precisely from an agreed diversity factor.

Unbalanced phase load means that one phase reaches its limit while the other two still have capacity left.

0 A4 A8 A12 A16 A9.0 AL113.5 AL25.5 AL3
  • Fuse 16 A
  • Planning limit 12.8 A
  • Even distribution 9.3 A
Example: circuit with a 16 A fuse and a planning limit of 80 %
The example in figures
PhaseMeasuredMargin to the planning limit
L19.0 A3.8 A
L213.5 AExceeded by 0.7 A
L35.5 A7.3 A
Even distribution9.3 A per phase3.5 A per phase
9.3 A

If the same load is distributed evenly, it becomes 9.3 A per phase – all three phases are below the planning limit, and there is room for more equipment without a new circuit. We agree the planning limit with you; in the example it is 80 % of the fuse.

Supply paths

Dual supply must actually be dual

Equipment with two power supplies is only redundant if they are plugged into separate PDUs, and the PDUs are fed from separate circuits. We record how it is actually connected.

Single-corded equipment can be supplied through an STS that switches between two supplies. Local extension leads in the racks are recorded because they are an extra single point of failure.

PDU APDU BServer · 2 PSUA and B in separate PDUsServer · 2 PSUBoth power supplies in PDU ASTSSwitch · 1 PSUOne power supply via STS
Typical findings in the supply paths
FindingConsequenceSolution
Both power supplies in the same PDUThe equipment goes down if the PDU or its circuit failsMove one power supply to the other PDU
Single-corded equipment without an STSThe equipment depends on one circuitAn STS or equipment with two power supplies
Local extension leadsAn extra link that can fail or be pulled outFixed outlets in the rack PDUs
PDU A and B from the same circuitBoth supply paths fail at the same timeThe PDUs are fed from separate circuits

Assessment and measures

From findings to a plan without interruption

The report assesses the server room as a whole and gives concrete proposals for improvements – prioritised by risk and effort and with an assessment of how they can be carried out without interrupting operations.

If the report points to replacing a system, e.g. a UPS system, we add a business case comparing operation, losses, service and lifetime for the existing and the new system.

Do nowPlanWhen convenientAssessEffortRisk12345
The measures prioritised by risk and effort
Examples of measures
MeasureDuring operation
1Redistributing load between the phasesYes, when the equipment has two power supplies
2Power supplies moved to separate PDUsYes, one power supply at a time
3Blanking panels in free rack spaceYes
4Setting cooling units and circuit breakersPlanned in a service window
5Replacing the UPS systemYes, via maintenance bypass and a planned changeover

The report

What the capacity report contains

The report is written so that both IT and facilities can use it: the overview first, the details at the back.

It is independent of products and suppliers and has the sole purpose of giving you the best possible technical environment within the financial framework.

Capacity report
Contents of the report
PartContents
Floor planThe server room with numbers on racks, cooling units and switchboards – also in a version with our comments
Switchboard overviewThe no-break switchboard with circuits, circuit breakers and load
Rack overviewAll racks with utilisation, supply and free space
UPS overviewLoad, reserve, batteries and redundancy
Inspection scheduleThe server room reviewed point by point
AssessmentOverall assessment of the condition and capacity of the server room
ImprovementsPrioritised measures and how they are carried out without interruption
Business caseWhen a system should be replaced: the existing and the new system compared
Rack by rackDrawing and schedule for every rack

Preparedness

The first step towards the continuity plan

In business continuity planning, the capacity report is a valuable first step. It makes the analysis manageable and delivers the technical facts the continuity plan has to build on.

  1. 01UPS audit

    Is the UPS system robust?

    Independent review of UPS system, batteries and supply.

  2. 02Capacity report

    How much is left?

    Space, power and cooling in the server room – rack by rack.

  3. 03Critical dependencies

    What does it rest on?

    Systems, network and physical supply – and their shared nodes.

  4. 04Business continuity plan

    What do we do?

    Roles, load prioritisation and testing – matched to the actual capacity.

You get

  • Floor plan with comments
  • Rack by rack documentation
  • Load per phase and room for expansion
  • Prioritised plan for improvements

Engineering continuity

Do you know how much capacity is left?

We map the server room rack by rack and switchboard by switchboard and show where there is room to expand – and what needs fixing first.