Assurance · Capacity report
Capacity report
How much space, power and cooling is left in the server room – and what does it take to expand without interrupting operations? A capacity report maps it rack by rack and switchboard by switchboard and becomes the link between IT and facilities.
- U by U
- Every rack is documented unit by unit with supply, PDU and free space
- 3 phases
- Load is measured per phase and compared with the upstream fuse
- A + B
- We record which equipment has dual supply and where an STS is missing
- Impartial
- The report is independent of products and suppliers
The link
Two areas of responsibility, one server room
In most companies the server room is shared by two areas that work closely together but each have their own focus. IT runs hardware and software. Facilities are responsible for the support equipment: switchboards, UPS, cooling, generator and fire systems.
Neither has the full picture of the other side – and it is exactly the other side that decides whether their own area can grow. The capacity report brings both sides together in one document.
The report shows the details the buyer needs. Before new equipment is purchased, you can see where it can be placed with the right space, power and cooling – and plan the budget accordingly.
The questions
What the report answers
The need for a capacity report typically arises when IT is expanding, when a system is nearing replacement, or when the business continuity plan needs facts about technical capacity.
The list is not exhaustive, but shows the questions we typically clarify.
- Space
- Power
- Cooling
- Supply paths
- Cabling
- Testing
| Area | What we clarify |
|---|---|
| Space | How rack space and the footprint of IT and power equipment are used – and whether it can be optimised to free up space without more cooling and new switchboards |
| Switchboards and circuit breakers | Capacity in the switchboards, the settings of the circuit breakers and which switchboards feed the rack PDUs |
| UPS systems | Load, reserve and redundancy compared with the capacity the system was built for |
| Cooling | The capacity of the cooling system and whether it is set correctly |
| Phase load | Whether the load is evenly distributed across the three phases, and a strategy for the diversity factor relative to the upstream fuse |
| Supply paths | Which equipment has dual supply, whether single-corded equipment has an STS, whether there are enough outlets in the racks, and whether local extension leads are used |
| Cabling | Whether fibre and patch cabling gets in the way of technicians and risks being disconnected during service in and around the racks |
| Testing | Whether switchboards and support equipment can be tested without putting critical operations at risk |
The survey
The whole server room, not just the racks
We go through the server room physically and record everything that affects capacity and operational reliability – from the installed hardware to switchboards, emergency power, cooling and infrastructure.
The result is collected on a floor plan where every rack, cooling unit and switchboard has its own number, and where our comments are written directly on the drawing.
| Area | What we record |
|---|---|
| 1Racks | Servers, hard disks, network equipment, audio and video and other equipment |
| 2PDUs | Which switchboards and circuits feed them, and how heavily they are loaded |
| 3No-break switchboard | Circuits, circuit breakers and load |
| 4UPS system and generator | Load, reserve, batteries and emergency power |
| 5Cooling units | Capacity, placement and settings |
| 6Infrastructure | Installation above and below 50 V, fibre, fire systems, lighting and working conditions |
Rack by rack
Every rack documented unit by unit
For each rack we make a drawing and a schedule showing the equipment in order from top to bottom: what it is, how many power supplies it has, and which PDU they are plugged into.
Free space and blanking panels are shown, so it is clear where new equipment can go and where the airflow is broken.
- Equipment
- Blanking panel
- Free space
- Both power supplies in the same PDU
| Column | What it shows |
|---|---|
| Position (U) | Where in the rack the equipment sits and how much space it takes |
| Type and name | What the equipment is and what it is called in your systems |
| Power supplies | Whether the equipment has one or two power supplies |
| PDU A and PDU B | Which PDU each power supply is plugged into, and which switchboard feeds the PDU |
| Comments | Faults and improvements, e.g. both power supplies in the same PDU or missing blanking panels |
Load
Load per phase decides the expansion
We measure the load per phase in the upstream switchboard and in the rack PDUs. Compared with the upstream fuse and the free space in the racks, the room for expansion can be calculated precisely from an agreed diversity factor.
Unbalanced phase load means that one phase reaches its limit while the other two still have capacity left.
- Fuse 16 A
- Planning limit 12.8 A
- Even distribution 9.3 A
| Phase | Measured | Margin to the planning limit |
|---|---|---|
| L1 | 9.0 A | 3.8 A |
| L2 | 13.5 A | Exceeded by 0.7 A |
| L3 | 5.5 A | 7.3 A |
| Even distribution | 9.3 A per phase | 3.5 A per phase |
If the same load is distributed evenly, it becomes 9.3 A per phase – all three phases are below the planning limit, and there is room for more equipment without a new circuit. We agree the planning limit with you; in the example it is 80 % of the fuse.
Supply paths
Dual supply must actually be dual
Equipment with two power supplies is only redundant if they are plugged into separate PDUs, and the PDUs are fed from separate circuits. We record how it is actually connected.
Single-corded equipment can be supplied through an STS that switches between two supplies. Local extension leads in the racks are recorded because they are an extra single point of failure.
| Finding | Consequence | Solution |
|---|---|---|
| Both power supplies in the same PDU | The equipment goes down if the PDU or its circuit fails | Move one power supply to the other PDU |
| Single-corded equipment without an STS | The equipment depends on one circuit | An STS or equipment with two power supplies |
| Local extension leads | An extra link that can fail or be pulled out | Fixed outlets in the rack PDUs |
| PDU A and B from the same circuit | Both supply paths fail at the same time | The PDUs are fed from separate circuits |
Assessment and measures
From findings to a plan without interruption
The report assesses the server room as a whole and gives concrete proposals for improvements – prioritised by risk and effort and with an assessment of how they can be carried out without interrupting operations.
If the report points to replacing a system, e.g. a UPS system, we add a business case comparing operation, losses, service and lifetime for the existing and the new system.
| Measure | During operation |
|---|---|
| 1Redistributing load between the phases | Yes, when the equipment has two power supplies |
| 2Power supplies moved to separate PDUs | Yes, one power supply at a time |
| 3Blanking panels in free rack space | Yes |
| 4Setting cooling units and circuit breakers | Planned in a service window |
| 5Replacing the UPS system | Yes, via maintenance bypass and a planned changeover |
The report
What the capacity report contains
The report is written so that both IT and facilities can use it: the overview first, the details at the back.
It is independent of products and suppliers and has the sole purpose of giving you the best possible technical environment within the financial framework.
| Part | Contents |
|---|---|
| Floor plan | The server room with numbers on racks, cooling units and switchboards – also in a version with our comments |
| Switchboard overview | The no-break switchboard with circuits, circuit breakers and load |
| Rack overview | All racks with utilisation, supply and free space |
| UPS overview | Load, reserve, batteries and redundancy |
| Inspection schedule | The server room reviewed point by point |
| Assessment | Overall assessment of the condition and capacity of the server room |
| Improvements | Prioritised measures and how they are carried out without interruption |
| Business case | When a system should be replaced: the existing and the new system compared |
| Rack by rack | Drawing and schedule for every rack |
Preparedness
The first step towards the continuity plan
In business continuity planning, the capacity report is a valuable first step. It makes the analysis manageable and delivers the technical facts the continuity plan has to build on.
-
01UPS audit
Is the UPS system robust?
Independent review of UPS system, batteries and supply.
-
02Capacity report
How much is left?
Space, power and cooling in the server room – rack by rack.
-
03Critical dependencies
What does it rest on?
Systems, network and physical supply – and their shared nodes.
-
04Business continuity plan
What do we do?
Roles, load prioritisation and testing – matched to the actual capacity.
You get
- Floor plan with comments
- Rack by rack documentation
- Load per phase and room for expansion
- Prioritised plan for improvements
Engineering continuity
Do you know how much capacity is left?
We map the server room rack by rack and switchboard by switchboard and show where there is room to expand – and what needs fixing first.