UPS MODULESWITH DISPLAYSYSTEM DISPLAYTOP CABLEENTRYSMART CONNECTIONINTERFACEBUILT-INMAINTENANCE BYPASSBOTTOM CABLEENTRYABB DPA 500 · PHOTO: ABB

RCDs and UPS systems: Protection against electric shock under HD 60364

How are persons protected against electric shock when the UPS system runs on battery and the circuits after the system have no residual current device (RCD)? Most people who design and install UPS systems meet the question. This case goes through the requirements in HD 60364, how much fault current a modular UPS system delivers in battery operation, and the four solutions that meet the requirements, with and without an RCD.

TopicContent
QuestionFault protection in battery operation without RCD
Earthing systemTN-S after the UPS system
Source in battery operationInverter with electronic current limitation
Disconnection time0.4 s at 230 V for circuits rated at most 63 A with socket-outlets and at most 32 A supplying only fixed connected equipment
StandardsHD 60364-4-41, HD 60364-5-53 and HD 60364-5-54
Example systemCentiel StratusPower with three SM30 modules in N+1
SolutionsVerified disconnection, voltage reduction according to Annex D.2, supplementary protective equipotential bonding or one RCBO per circuit

Why does the question arise?

Schneider Electric (APC) describes how the EMI filters in UPS systems produce a continuous leakage current to earth, and how the UPS system together with several loads easily exceeds 30 mA without any fault. Schneider Electric therefore recommends avoiding 30 mA RCDs upstream of UPS systems.

Where the circuits after the UPS system have no RCD, fault protection relies on the circuit breakers. They must disconnect within the disconnection time, and this requires the fault current to be at least Ia (HD 60364-4-41, 411.4.4). In battery operation the mains is not present, and the fault current comes only from the inverters:

ItemIn battery operationSource
SourceThe inverters, because the mains is goneCentiel, StratusPower technical specification
Fault currentSM30: 3 × In for 40 ms, then lessCentiel, StratusPower technical specification
Requirement for the circuit breakerDisconnection within 0.4 s, and the fault current must be at least IaHD 60364-4-41, 411.3.2.2 and 411.4.4

This is where the question arises: Is the fault current from the inverters large enough for the circuit breaker to disconnect within the time the standard requires?

BATTERY OPERATIONBatteryMains is goneInverter3 × In, 40 msCircuit breakerRequires at least IaFault to PEExposed partDisconnection within 0.4 s (HD 60364-4-41, 411.3.2.2)
Gruppeafbrydere i en fordelingstavle
PhotoCircuit breakers in a distribution board

What does HD 60364 require of fault protection?

In the event of a fault of negligible impedance between a line conductor and an exposed conductive part, a protective device shall automatically disconnect the supply (HD 60364-4-41, 411.3.2.1). In TN systems at 230 V AC, the maximum disconnection time is 0.4 s for circuits rated at most 63 A with one or more socket-outlets and circuits rated at most 32 A supplying only fixed connected equipment (411.3.2.2 and Table 41.1).

Whether disconnection happens in time is decided by the fault loop. Clause 411.4.4 sets the requirement Zs × Ia ≤ U0:

QuantityMeaningIn battery operation
ZsImpedance of the fault loop: the source, the phase conductor to the fault and the protective conductor backThe source is the inverters
IaThe current that operates the protective device within the disconnection time. For an RCD, Ia equals IΔnUnchanged
U0Voltage between phase and earth, 230 VUnchanged

ABB states according to IEC/EN 60898-1 that a type B miniature circuit breaker trips in less than 0.1 s at 5 × In, and a type C at 10 × In. As 0.1 s is within 0.4 s, the upper limit of the magnetic release can be used as Ia:

Circuit breakerMagnetic trippingIa
B163–5 × In80 A
B203–5 × In100 A
C165–10 × In160 A
C205–10 × In200 A
C325–10 × In320 A

In battery operation, the inverters are the source in the fault loop. The requirement can therefore be put like this: The fault current at the fault must be at least Ia.

The fault current is not the current that passes through a person. The fault current flows in the fault loop (411.4.4). A person touching the exposed conductive part and another conductive part at the same time is subjected to the voltage between the two parts. This is the voltage the standard limits where disconnection cannot be achieved in time:

The fault currentThe voltage between simultaneously accessible parts
WhereIn the fault loop: the source, the line conductor and the protective conductor (411.4.4)Between the exposed conductive part and other conductive parts
RequirementAt least Ia, so the protection disconnects within the disconnection time (411.4.4)At most 50 V AC where disconnection cannot be achieved in time (415.2.2 and Annex D.2 and D.3)

An RCD is independent of the inverter. For a 30 mA RCD, the requirement gives Zs ≤ 230 V / 0.03 A, about 7,700 Ω. This limit is met with a wide margin, however little current the inverters deliver.

InverterSource in the loopCircuit breakerTrips at IaExposed partLFaultProtective conductor (PE)Zs × Ia ≤ U0Zs = inverter + phase conductor + PE
Automatsikringer med C-karakteristik i en gruppetavle
PhotoMiniature circuit breakers with type C characteristic in a distribution board
InverterBattery operationC16LFaultRackExposed partPEBack to the source via the N-PE connection in the main boardExtraneous-conductive-partVoltage betweenthe parts

The fault current flows in the fault loop. The person is subjected to the voltage between the two parts

Where disconnection cannot be achieved in time, the voltage between simultaneously accessible parts shall not exceed 50 V AC (Annex D.3)

Fault current and voltage between parts in battery operation

How much fault current do the inverters deliver?

Centiel's technical specification for StratusPower states the short-circuit capability per module, and the time can be set from 40 to 400 ms. For SM10, SM20, SM25 and SM30, the specification has a note that the maximum current falls for durations above 40 ms. It does not state by how much. For these four modules, the values below therefore only apply to the first 40 ms:

ModuleIn at 230 VShort-circuit capabilityFault current
SM1014.5 A3 × In43.5 A for 40 ms
SM2029.0 A3 × In87.0 A for 40 ms
SM2536.2 A3 × In108.6 A for 40 ms
SM3043.5 A3 × In130.5 A for 40 ms
SM5072.5 A3.5 × In253.8 A
SM6290.6 A3 × In271.8 A

In N+1, all modules share the load, and they also deliver the fault current together. A system with three SM30 modules therefore delivers 391.5 A. The redundancy only means that the system raises an alarm when the load increases so much that N+1 is no longer met.

For SM30, the fault current at 0.4 s, the time the circuit requirement is about, is therefore not documented. Nor does the specification say what the inverters do when the set time has expired, whether they continue in current limitation, shut down or something else.

0 A100 A200 A300 A400 A0 ms100 ms200 ms300 ms400 ms500 msNot documentedCurrent falls after 40 msIa C16Ia B160,4 s391,5 A · 40 msThree SM30 modules: 3 × 3 × In for 40 ms
UPS-moduler i et Centiel StratusPower-skab
IllustrationUPS modules in a Centiel StratusPower cabinet

What does the standard say when disconnection cannot be achieved?

The standard covers precisely the situation where a source with limited short-circuit current cannot operate the overcurrent protection in time. The requirements are in two parts, HD 60364-4-41 and HD 60364-5-53:

ClauseRequirement
4-41, 411.3.2.5Where it is not possible for overcurrent protective devices to disconnect the supply according to 411.3.2, or where an RCD is not suitable for this purpose, reference is made to Annex D
4-41, 411.3.2.6If automatic disconnection cannot be achieved within the disconnection time, supplementary protective equipotential bonding according to 415.2 shall be provided
4-41, Annex D.1Annex D applies where electronic equipment with limited short-circuit current is installed, or where the tripping times cannot be achieved by protective devices
4-41, Annex D.2In case of a fault to PE or earth, an electronic power converter shall reduce its output voltage to 50 V AC or less within the disconnection time. The manufacturer shall specify methods for initial and periodic verification
4-41, Annex D.3Where D.2 does not apply, supplementary protective equipotential bonding is required, and the voltage between simultaneously accessible parts shall not exceed 50 V AC
5-53, 531.2.2If the overcurrent protection cannot meet the disconnection time in a TN system, that part of the installation shall be protected by an RCD according to 531.3.5.2

Clause 415.1.2 states that an RCD shall not be the sole means of protection. The clause is part of additional protection. Under 531.2.2, the RCD is the fault protection itself, and clause 411.4.5 lists RCDs as protective devices for fault protection in TN systems. Note 1 to 411.4.5 requires the circuit then also to have overcurrent protection.

There are therefore three routes when the circuit breaker cannot disconnect in time. Together with verifying the disconnection itself, this gives four solutions, covered in the following sections.

Can disconnection within 0.4 sbe verified with the inverter current?NORCD5-53, 531.2.2Voltage ≤ 50 VAnnex D.2Equipotential bonding411.3.2.6 / D.3Unbroken neutralManufacturer statementR ≤ 50 V / Ia
TransformerSystem earthMains has failedMain boardPENNPEUPS (transformerless)InverterBattery operationBatteryDistribution boardRackExposed partLNPERCBO30 mAFaultFault current returns via PEN and PE are not connectedafter the UPS system

The RCBO disconnects when the residual current reaches the rated residual operating current IΔn (411.4.4)

N has its earth reference from the N-PE connection in the main board. The neutral must not be switched upstream of the UPS system

Fault on the output in battery operation: three ways to protect

Solution 1: Verified disconnection without RCD

The first solution is to verify that the circuit breaker disconnects in time with the current the inverters deliver. This requires the fault current to be documented at the time that matters, and the breaker's tripping time at that current to be known.

This is where the timing becomes a problem. The StratusPower inverters are only documented at 3 × In for 40 ms, while ABB, according to IEC/EN 60898-1, states tripping in less than 0.1 s at the magnetic limit. Between 40 and 100 ms it is not known whether the current is still above Ia, and the breaker may trip in that window. This must be documented by the manufacturers:

WhoWhat must be documented
UPS manufacturerFault current per module at 0.4 s and 5 s, and what the inverters do when the set time has expired
Breaker manufacturerTripping time at the fault current the inverters deliver, usually read from the tripping curve
InstallerFault loop impedance, cable lengths and cross-sections, and the number of modules in operation

The solution favours type B, short cables and large cross-sections, because they give the lowest Ia and the smallest impedance. It only holds as long as the system runs with the number of modules the calculation is based on, and it must be recalculated when circuits are extended or moved.

AssessmentMainly theory

As long as the fault current at 0.4 s is not documented, disconnection cannot be verified. It only becomes practical if the UPS manufacturer documents the fault current over the entire disconnection time.

Advantages

  • No extra components in the board, and leakage current sets no limit on the number of devices
  • The circuit breaker protects against both overload and faults

Disadvantages

  • Requires the fault current at 0.4 s, which UPS manufacturers do not document. StratusPower is only documented for 40 ms
  • Only holds with the number of modules the calculation is based on, and must be recalculated whenever the circuits change
0 ms20 ms40 ms60 ms80 ms100 ms120 msINVERTERS DELIVER 3 × INTRIPPING BELOW 0.1 S (ABB, IEC/EN 60898-1)Must be documented40–100 ms

Solution 2: The inverters reduce the voltage (Annex D.2)

Annex D.2 of HD 60364-4-41 turns the requirement around. Instead of the breaker disconnecting, the source itself must reduce its output voltage to 50 V AC or less in case of a fault between a live conductor and PE or earth, and it must do so within the disconnection time. 50 V AC is the limit set by Annex D.

Requirement in D.2Meaning
Applies to power converters with U0 above 50 V ACThe circuits after the UPS system have U0 = 230 V
The voltage is reduced to 50 V AC or lessThe inverter must detect the fault and respond to it
Within the time in 411.3.2.20.4 s for the circuits after the UPS system
The manufacturer specifies verification methodsFor both initial and periodic verification of the installation

The solution stands or falls with the manufacturer's documentation. The StratusPower technical specification does not mention Annex D.2, and it refers to the UPS safety standard EN 62040-1, while Annex D.2 refers to EN 62477-1 for power electronics. Whether a UPS system meets D.2 must therefore be confirmed in writing by the manufacturer, together with the method for verifying it.

AssessmentMainly theory

Even with the manufacturer's declaration, the solution is rarely suited to critical loads, because a single fault removes the supply from all circuits at once. That is the opposite of what the UPS system is meant to ensure.

Advantages

  • Does not depend on the circuit breaker's tripping time or on the size of the fault current

Disadvantages

  • The inverters reduce the voltage on the entire UPS output. A fault in one circuit removes the supply from all critical loads
  • Requires a written declaration and a verification method from the manufacturer. The StratusPower technical specification does not mention D.2
0 V50 V230 V00,1 s0,4 sFAULTDISCONNECTION TIMEThe output voltage must be down to 50 V AC or less before the disconnection time

Solution 3: Supplementary protective equipotential bonding

The third solution requires neither manufacturer data nor RCDs. All exposed and extraneous conductive parts that can be touched simultaneously are connected, so that no dangerous voltage can arise between them while the fault persists. The bonding shall include all exposed conductive parts of fixed equipment and all extraneous conductive parts, and it shall be connected to the protective conductors of all equipment, including those of socket outlets (HD 60364-4-41, 415.2.1).

The resistance between simultaneously accessible parts shall meet R ≤ 50 V / Ia (415.2.2). For miniature circuit breakers, Ia is here the current that operates the breaker within 5 s. Using the magnetic limit, which always gives tripping within 5 s, keeps the requirement on the safe side:

Circuit breakerIaMaximum resistance R
B1680 A0.63 Ω
C16160 A0.31 Ω
C32320 A0.16 Ω

The bonding conductors have cross-section requirements (HD 60364-5-54, 544.2):

ConnectionRequirement
Between two exposed conductive partsAt least the same conductance as the smallest protective conductor to the parts (544.2.1)
Between exposed and extraneous conductive partsAt least half the cross-section of the corresponding protective conductor (544.2.2)

The requirement covers all simultaneously accessible parts, so the bonding must be extended whenever new equipment is added. The bonding does not exclude the need to disconnect the supply for other reasons, e.g. protection against fire (415.2, note 2).

AssessmentPractical in confined rooms

In a server room with fixed racks and a fixed bonding bar, the solution can be verified and maintained. Where equipment is often moved and replaced, it becomes hard to keep in order.

Advantages

  • Requires neither data from the UPS manufacturer nor RCDs
  • The circuit breakers can be used as they are, and leakage current sets no limit

Disadvantages

  • All simultaneously accessible parts must be included, also equipment added later
  • The resistance must be verified and kept low, e.g. at most 0.31 Ω for C16, and the fault persists until it is found
RackExposed partExtraneous partE.g. reinforcementCooling unitExposed partEquipotential bonding barR ≤ 50 V / IaIa = operating current within 5 s
Potentialudligningsskinne med grøn/gule udligningsledere
PhotoEquipotential bonding bar with green/yellow bonding conductors

Solution 4: One RCBO per circuit after the UPS system

An RCD after the UPS system disconnects at its rated residual current, however little fault current the inverters deliver. It is therefore the solution that can be verified without data from the UPS manufacturer. HD 60364-5-53, clause 531.2.2, points precisely to RCDs where the overcurrent protection cannot meet the disconnection time. The solution requires three things:

RequirementClauseMeaning
Neutral with earth reference5-53, 531.3.5.2N gets its earth reference at the PEN split in the main board and is carried through the UPS system. N and PE must not be connected after the RCD
Neutral is not switched upstream of the UPS system5-53, 531.2.2In StratusPower, the neutral is common from input to output. If the neutral is switched between the PEN split and the system, the output loses its earth reference
One RCBO per circuit5-53, 531.3.2 and 531.3.6The leakage current downstream of an RCD shall not exceed 0.3 × IΔn. An RCD of at most 30 mA providing both fault protection and additional protection shall not disconnect all circuits fed from a common supply circuit

Clause 543.4.3 of HD 60364-5-54 prohibits connecting the neutral to any other earthed part once N and PE are run as separate conductors. No new N-PE connection may therefore be made after the UPS system. What matters is that the neutral is not interrupted on the way. Otherwise the system behaves as a floating IT system, and automatic disconnection of supply is no longer met.

The leakage current limits how much equipment each circuit can carry. An RCD may trip at as little as 50 % of its rated residual current (531.3.2):

IΔnMaximum leakage in normal operationMay trip from
30 mA9 mA15 mA
100 mA30 mA50 mA
300 mA90 mA150 mA

The number of devices per circuit is found by dividing the leakage budget by the devices' leakage current from their datasheets. HD 60364-5-54, 543.7, note 3, also points out that equipment with a high protective conductor current is not necessarily compatible with installations with RCDs. The RCD types are defined in 531.3.3:

TypeOperates on
ACSinusoidal AC residual current
AAs AC, plus pulsating DC residual current
FAs A, plus composite residual currents in circuits between phase and neutral and pulsating DC superimposed on smooth DC
BAs F, plus AC up to 1,000 Hz, rectified DC from two or more phases and smooth DC residual current
AssessmentPractical

The solution is built on standard components and can be verified at handover and at periodic verification. It is the solution that holds when the installation changes over time.

Advantages

  • Disconnects at IΔn, however little fault current the inverters deliver
  • Only the faulty circuit is disconnected. The rest of the critical load remains supplied
  • Can be verified with ordinary measurements at handover, without data from the UPS manufacturer

Disadvantages

  • Leakage current limits the number of devices per circuit and means more circuits in the board
  • The neutral must run unbroken from the PEN split through the UPS system
Main boardN-PE connectionUPS systemN passes throughRCBOCircuit 1RackRCBOCircuit 2RackRCBOCircuit 3Rack
LEAKAGE CURRENT DOWNSTREAM OF A 30 MA RCD0 mA9 mA15 mA30 mAPermitted (0.3 × IΔn)May trip (from 50 %)
RCBO med C16 og 30 mA, som bruges én pr. gruppe
PhotoRCBO with C16 and 30 mA, used one per circuit

When the neutral or PE is broken

All four solutions require the neutral to have an earth reference and the protective conductor to be intact. HD 60364-4-41 requires the neutral point of the supply system to be earthed (411.4.2), and earthing in TN systems relies on a reliable and effective connection of PEN or PE conductors to earth (411.4.1). When the UPS system runs on battery, it is the system's neutral point that must be earthed, and this is done via the N-PE connection in the main board.

Where the break occursWhat happensHow it is prevented
Before the PEN split, e.g. a supply cable dug throughThe mains is gone and the UPS system goes to battery operation. The N-PE connection in the main board is intact, so the neutral keeps its earth referenceNo special measure is required
On the neutral between the PEN split and the UPS systemThe system behaves as a floating IT system, and the inverters cannot deliver enough fault current to operate the overcurrent protectionNo 4-pole devices upstream of the UPS system. HD 60364-5-53, 531.2.2, states that in TN-S the neutral need not be switched if the neutral conductor can reliably be regarded as being at earth potential.
On the protective conductorThe fault loop in 411.4.4 runs through the protective conductor. Without it there is no loop for the fault current to flow inThe standard has no separate requirement concerning a broken PE. Where the protective conductor current exceeds 10 mA, HD 60364-5-54, 543.7, requires a reinforced protective conductor

Clause 543.6 states that a reinforced protective conductor shall be used where its current exceeds 10 mA in normal operation. Clause 543.7 gives two ways for current-using equipment intended for permanent connection:

Equipment connectionProtective conductor requirement
Only one protective earthing terminalAt least 10 mm² Cu or 16 mm² Al throughout its length
Separate terminal for an additional protective conductorAn additional protective conductor of at least the cross-section required for fault protection, run from a point where the protective conductor is at least 10 mm² Cu or 16 mm² Al

The protective conductor shall also be in the same wiring system as the live conductors or in their immediate proximity when overcurrent protection is used for protection against electric shock (543.8).

One N-PE connection, in the main board. PE and N are separated in the main board with only one connection between the neutral points and PE. HD 60364-5-54, 543.4.3, prohibits reconnecting the neutral to earthed parts after the separation.

TransformerNeutral pointMain boardN-PE connectionUPS systemN passesRack1231Break before the PEN splitN-PE in the main board keeps the reference2Break on N after the splitFloating IT system3Break on PENo fault loop, see 411.4.4
Main boardL1L2L3NPEPENSupply cableN-PE connectionTo the UPS system
IllustrationThe PEN conductor is connected to the PE bar. After the split, N shall not be connected to earthed parts again (HD 60364-5-54, 543.4.3)
Utility transformerSystem earthSupply cable dug throughPENMain boardNPELNPEInverterBattery operationUPS (transformerless)RackExposed partFault

The neutral keeps its earth reference via the N-PE connection in the main board

HD 60364-4-41, 411.4.2: The neutral point of the supply system shall be earthed

Breaks on the neutral and PE around a transformerless UPS system in battery operation

What about an RCD upstream of the UPS system?

An RCD on the UPS system's input shall disconnect all live conductors of the protected circuit (HD 60364-5-53, 531.3.1), and therefore also the neutral. That is 4-pole switching upstream of the system. If the RCD trips, the UPS system's neutral loses its earth reference while the system continues on battery.

The manufacturers also describe leakage currents that make a sensitive RCD unsuitable upstream of the system:

ManufacturerRequirement for an upstream RCD
Schneider Electric (APC), Galaxy VXType B RCD, sized for leakage up to 3 A at start-up and at most 350 mA continuously
Schneider Electric (APC), Galaxy VSAn RCD upstream of the system is not possible in TN systems because of the leakage from the functional earth
Eaton, 93PM G2Type B RCD only, because the system can cause DC current in the PE conductor
Vertiv, Liebert EXMAdjustable sensitivity of 0.3–3 A. Vertiv recommends confirming the sensitivity of the RCDs both upstream and downstream of the system

If an RCD upstream of the UPS system is nevertheless required, it must be selected according to the manufacturer's instructions, and the effect on the neutral's earth reference when it trips must be assessed.

Main boardN-PE connectionRCDOpens L and NUPS systemBattery modeRackLoadWHEN THE RCD TRIPSThe neutral is opened upstream of the UPSThe UPS neutral loses its earth reference
Hovedtavle med hovedafbryder (main incomer) og en sektion mærket UPS Neutral Link Section
PhotoMain board with main incomer and a section labelled UPS Neutral Link Section

What do the manufacturers say?

The manufacturers' installation instructions and technical documents confirm the picture. They mainly address RCDs upstream of the system and, in one case, protection in battery operation:

Manufacturer and documentWhat the document says
Schneider Electric (APC), Galaxy VS Earthing Principles 990-95151A (2024)An RCD upstream of the system is not possible in TN systems, because the leakage current from the system's functional earth makes it malfunction. In a fault on the output upstream of the distribution in battery operation, without bypass, the available power cannot activate the protective device. The inverter shuts down in five seconds, and an RCD would still disconnect
Schneider Electric (APC), Galaxy VX operation manualAn upstream type B RCD shall be sized so it does not trip on the leakage current: up to 3 A at start-up and at most 350 mA continuously
Schneider Electric (APC), FAQ000281380Avoid 30 mA RCDs upstream of UPS systems. Feed the output into a small distribution board with one RCBO per circuit
Eaton, 93PM G2 User's and Installation GuideThe product can cause DC current in the PE conductor, so only a type B RCD is allowed on the supply side
Vertiv, Liebert EXM 80–200 kVA User Manual (2023)The EMC filter gives a leakage current below 3,000 mA. An upstream RCD shall have an adjustable sensitivity of 0.3–3 A, and Vertiv recommends confirming the sensitivity of the RCDs both upstream and downstream of the system
Centiel, StratusPower Technical Specifications WI-4-00154-REV08 (2025)Short-circuit capability 3 × In (SM50: 3.5 × In), selectable from 40 to 400 ms. For SM10–SM30 the maximum current falls above 40 ms

Schneider Electric's document for Galaxy VS directly describes a fault on the output in battery operation: The overcurrent protection cannot be relied on, and the inverter only shuts down after five seconds. This does not meet the 0.4 s requirement for the circuits.

SCHNEIDER ELECTRIC (APC)≤ 350 mA leakageGalaxy VX, continuousSCHNEIDER ELECTRIC (APC)Off after 5 sGalaxy VS, battery modeEATONType B RCD only93PM G2, supply sideVERTIVRCD 0.3–3 ALiebert EXM, upstreamCENTIEL3 × In · 40 msStratusPower, per module

Worked example: StratusPower with three SM30 modules

The example is a StratusPower system with three SM30 modules in N+1, where all three modules deliver the fault current. A circuit in XLPE-insulated 2.5 mm² copper cable supplies a rack. Phase and PE have the same cross-section. Schneider Electric states that for the minimum short-circuit current, the resistivity shall be taken at the cable's maximum permissible operating temperature, and according to IEC 60909-0 and CENELEC TR 50480 it is 0.02369 Ω·mm²/m for copper at 90 °C. The calculation is made for two cable lengths:

Step30 m cable80 m cable
Fault current from three modules for 40 ms391.5 A391.5 A
Loop resistance of the cable2 × 30 × 0.02369 / 2.5 = 0.569 Ω2 × 80 × 0.02369 / 2.5 = 1.516 Ω
Maximum current the cable allows230 V / 0.569 Ω = 404.5 A230 V / 1.516 Ω = 151.7 A
Fault current at the fault391.5 A151.7 A

In the calculation, the fault current is the lower of the inverter current and the current the cable allows. This is a simplification, because how the inverters behave when the cable limits the current is not documented. The fault current is compared with Ia for the most common circuit breakers:

Circuit breakerIa30 m: above Ia for 40 ms80 m: above Ia for 40 ms
B1680 AYesYes
C16160 AYesNo
C20200 AYesNo
C32320 AYesNo

Even where the fault current exceeds Ia, it only does so during the first 40 ms. Whether the breaker trips within those 40 ms must be documented with the breaker manufacturer's tripping curve, and what the inverters deliver after that must be documented by the UPS manufacturer.

Without that documentation, disconnection cannot be verified. What remains is one RCBO per circuit or supplementary protective equipotential bonding.

30 m cable391,5 A80 m cable151,7 AB1680 AC16160 AC20200 AC32320 AFault current at the fault during the first 40 ms, three SM30 modules
Inverter3 × SM30391.5 A, 40 msC16FaultRackLPE30 m · 2.5 mm² CuCable loop resistance0.569 ΩFault current at the fault391.5 ALimited byThe invertersAbove Ia for C16 (160 A) for 40 msYes
IllustrationThe fault loop in the worked example: three SM30 modules, a C16 and a 2.5 mm² cable of 30 or 80 m

Which solution to choose?

Which solution can be used depends on what the manufacturers can document and on how much the installation changes over time:

SolutionPreconditionLimitation
Verified disconnectionFault current at 0.4 s and the breaker's tripping time are documentedMust be recalculated after changes and depends on the number of modules in operation
Voltage reduction (D.2)The manufacturer declares that the system meets D.2 and specifies a verification methodDepends entirely on the manufacturer's declaration
Supplementary bondingAll simultaneously accessible parts are connected and R ≤ 50 V / Ia is metMust be extended whenever new equipment is added
One RCBO per circuitThe neutral runs unbroken from the PEN split through the UPS system, and leakage is below 0.3 × IΔn per circuitThe leakage current limits the number of devices per circuit

One RCBO per circuit is the only solution that depends neither on data from the UPS manufacturer nor on bonding that must be maintained. In return, the leakage current per circuit must be kept within budget, and the neutral must run unbroken from the PEN split to the UPS output before the RCBOs can do their job.

How UPS systems are otherwise sized, installed and earthed is described in Everything about UPS systems.

Does the manufacturer document fault currentat 0.4 s or Annex D.2?YESNOVerify disconnectionor verify according to D.2One RCBO per circuitwith unbroken neutralAlternative: supplementary bonding
Færdigt tavleanlæg med effektafbrydere og gruppefelter i et teknikrum
PhotoFinished switchboard with circuit breakers and outgoing sections in a technical room

Sources

  • HD 60364-4-41:2017+A11+A12, clauses 411, 415 and Annex D
  • HD 60364-5-53:2022, clause 531
  • HD 60364-5-54:2011+A1:2022, clauses 543 and 544
  • ABB: Electrical installation solutions for buildings, Technical details, miniature circuit-breakers, 9AKK107991A8329 (tripping characteristics according to IEC/EN 60898-1)
  • Schneider Electric: Electrical Installation Guide, chapter G, resistivity according to IEC 60909-0 and CENELEC TR 50480
  • Centiel: StratusPower 400V Technical Specifications, WI-4-00154-REV08 (2025)
  • Schneider Electric: UPS Installations with RCDs, FAQ000281380
  • Schneider Electric: Galaxy VS Earthing Principles, 990-95151A (2024)
  • Schneider Electric: Galaxy VX Operation Manual, 990-5452
  • Eaton: 93PM G2 UPS User's and Installation Guide
  • Vertiv: Liebert EXM 80–200 kVA UPS User Manual (2023)