Assurance · Compliance
Compliance & documentation
When the auditor, the insurer or the authorities ask, the documentation has to be ready. We document service, tests and measurements on your critical infrastructure – traceable and to the standards the installation was built and tested to. Everything is collected on My page, where you fetch it yourself whenever you need it.
- 2025
- The Danish CER Act and NIS2 Act entered into force on 1 July 2025
- 13.1
- The point in EU Regulation 2024/2690 that requires maintenance and testing of power and cooling supply
- A.7.11
- The ISO/IEC 27001 control that protects against failure of power and other utilities
- 1 login
- All reports for your installations in one place on My page
Requirements
Many requirements, one question
Documentation of the technical infrastructure is requested from several sides at once: authorities, certification bodies, insurers and your own management.
The requirements are worded differently, but they ask the same thing: Does the emergency power work, and can you prove it?
- Danish actCER Act
- Danish actNIS2 Act
- EU regulation2024/2690, point 13.1
- StandardISO/IEC 27001, A.7.11
- Danish orderElectrical installations
- InsuranceFire risk assessment
- EvidenceTest under load
- EvidenceService and findings
- EvidenceMeasurements
| Requirement | What it means for the technical infrastructure |
|---|---|
| CER Act (Danish)Act no. 433 of 6 May 2025 | Critical entities must carry out a risk assessment and have and apply a resilience plan. The plan must show how the entity prevents, withstands and recovers from incidents, such as a prolonged power outage. |
| NIS2 Act (Danish)Act no. 434 of 6 May 2025 | Risk management must include business continuity, among other things. For essential entities, the authority can demand documentation that the cybersecurity policies have been implemented. |
| EU Regulation 2024/2690Annex, point 13.1 | Applies to providers of data centre and cloud services, among others. They must protect against power failures, consider redundancy, have contracts for emergency supply such as fuel, and maintain and test the supply of power, temperature and humidity. The protection must be tested and reviewed regularly. |
| ISO/IEC 27001:2022Control A.7.11 | Information processing facilities must be protected from power failures and other disruptions caused by failures in supporting utilities. In a certification audit, the auditor typically asks for test and service records for the UPS system and generator. |
| Electrical installations (Danish)Executive Order no. 1082 of 12 July 2016, chapter 6 | A new or modified installation must be verified before it is put into service, and the verification documented to DS/HD 60364-6. The owner is responsible for the installation meeting the executive order. |
| InsuranceFire risk assessment | Many insurers recommend or require documented thermography of switchboards as part of the fire risk assessment. |
Deadlines and requirements for critical entities are on the page about the CER Act, and we cover the risk assessment itself under Risk assessment.
What we document
Every job ends in a document
All work we carry out on your critical infrastructure is completed with a document that can be used in operations, audits and inspections. It describes what was examined, what was measured and what needs to be corrected.
The measurements are held up against the standard that applies to that specific test, so the result can be verified.


| Job | Document | Basis |
|---|---|---|
| UPS service | Service report with operating data, alarm history, findings and recommendations | The manufacturer's service programme and your service agreement |
| Battery test | Test report with measurements per block and string and the measured autonomy | IEC 60896-21 and EN IEC 62485-2 |
| Load test | Test report with load steps and measured voltage, current, power and frequency | DS/EN IEC 62040-3 for UPS systems and ISO 8528-5 for generator sets |
| Switchboard thermography | Thermography report with images, temperatures and prioritised findings | Fire risk assessment and the insurer's requirements |
| Power quality measurement | Measurement report with trends, events, harmonics and voltage conditions | IEC 61000-4-30 Class A, assessed against DS/EN 50160 |
| Commissioning | Test protocols for each level up to Integrated Systems Testing | The project's test plan, DS/EN IEC 62040-3 and ISO 8528-5 |
| Verification of electrical installations | Verification report for the new or modified installation | DS/HD 60364-6 |
| Capacity report | Rack by rack, load per phase and supply paths | Measurements in switchboards and PDUs |
The audit
When the auditor asks
An audit is rarely about whether a report exists. It is about whether the report can be traced back to the installation, the date, the technician and the measurement.
That is what is called traceability. If one link is missing, the documentation is weaker.
- InstallationSerial number and location
- MeasurementDate, technician and instrument
- ReportFindings and recommendations
- My pageCollected per installation
- AuditDocumented and traceable

| The question | The answer is in |
|---|---|
| When was the UPS system last tested under load? | The test report with date, load steps and measured values |
| Do the batteries deliver the autonomy the continuity plan assumes? | The battery test with the measured autonomy compared with the calculated autonomy |
| Has the generator been tested with real load? | The load test with load acceptance, voltage and frequency |
| Have the findings from the last visit been corrected? | The service reports side by side, showing what has been corrected and what is still open |
| Who carried out the work? | The technician named in the report and Bluecircle's authorisation as an electrical contractor |
My page
The documentation is ready when you need it
All our customers get access to My page, including for one-off jobs such as an audit, a thermography survey or a load test. The reports are uploaded when the work is completed, and you are notified by e-mail.
When the auditor asks, you fetch the report yourself without waiting for us.
| On My page | What you get |
|---|---|
| Documents | Service reports, test reports, contracts and invoices, ready to download |
| Installations | Capacity, topology, redundancy, location, serial number, batteries and autonomy for each installation |
| Messages | Write to us directly, with the full history kept |
| E-mail notifications | Your contact persons get an e-mail when something new is uploaded |
| Login | One-time code by e-mail, only to the addresses we have registered for you |
| Service agreement | Your own prices and the option to put together an agreement directly on the page |
Questions
Frequently asked questions
Answers to what we are asked most often when documentation of the technical infrastructure is needed for an audit or by an authority.
Who gets access to My page?
All customers we have carried out work for. We create your contact persons, and they log in with their e-mail address and a one-time code. There is no password to remember.
Can we use the reports in our work with the CER Act and the NIS2 Act?
Yes, as documentation of testing and maintenance of the physical infrastructure, such as power, UPS systems, generators and cooling. The risk assessment and the resilience plan themselves are yours. We can help with a risk assessment.
What is the difference between a service report and a test report?
The service report describes the condition of the installation at the visit: operating data, alarms, findings and recommendations. The test report documents how the installation performs during a specific test, such as a load test or a battery test, with measured values compared with the requirement.
Is thermography required by law?
No, not generally in Denmark. But responsibility for the electrical installations lies with the owner, and many insurers recommend or require documented thermography as part of the fire risk assessment.
Why measure power quality to Class A?
Class A in IEC 61000-4-30 defines measurement methods and accuracy so that results from different instruments can be compared. The measurement therefore holds up, even when it is set against another instrument's result.
Can we get documentation for installations that others have installed?
Yes. A UPS audit reviews the installation, batteries and supply regardless of who supplied them, and documents their condition as it is today.
Engineering continuity
Can you document that the emergency power works?
We test, measure and document your critical infrastructure and collect it all on My page.